ASIC/FPGA Design and Verification Out Source Services
Digital DesignSynthesis General Flow
- Post synthesis simulation is strongly recommended.
- A full coverage functional test is not required at this point. It is recommended, however, to pass one or two tests in this point.
- Note: This simulation does not replace a gate level simulation, with back annotated timing.
- The post synthesis simulation requires vendor specific libraries.
|